- ₱868.1 millionOn-goingMetro Manila Flood Management Project, Phase 1, Construction of Tatalon Pumping StationTatalon · 2024p.2
- ₱568.9 millionOn-goingMetro Manila Flood Management Project, Phase 1, Construction of Doña Imelda Pumping StationTatalon · 2024p.2
- ₱300 millionOn-goingPlant Design, Supply and Installation of the Metro Manila Flood Management Project, Phase I, Construction of Roxas Ii Pumping StationRoxas · 2024p.1
- ₱282.9 millionOn-goingConstruction of Mariblo Pumping Station (Phase 1)No barangay listed · 2024p.3
- ₱282.8 millionOn-goingConstruction of Sta. Cruz Pumping Station (Phase 1)Sta. Cruz · 2024p.2
- ₱261.3 millionOn-goingConstruction of Roxas 1 Pumping StationRoxas · 2024p.1
- ₱190.4 millionOn-goingConstruction of Flood Mitigation Structure along Marikina River, Barangay Batasan HillsBatasan Hills · 2024p.1
- ₱189.1 millionOn-goingConstruction of Flood Mitigation Structure along Marikina River, Barangay Batasan HillsBatasan Hills · 2025p.1
- ₱145.5 millionOn-goingRehabilitation of Flood Mitigation Structure along San Juan River (Phase Lxvi)No barangay listed · 2025p.2
- ₱143.3 millionOn-goingConstruction of Flood Structure at Barangay Bagong Silangan Q.C.Bagong Silangan · 2024p.1
- ₱143.3 millionCompletedConstruction of Flood Control Structure along Tullahan River and Tributaries, Barangay GulodGulod · 2024p.1
- ₱141.9 millionOn-goingConstruction of West Riverside Pumping Station, Barangay Del MonteDel Monte · 2025p.1
- ₱141.8 millionOn-goingConstruction of River Capacity Enhancement Structure along San Juan River, Package 8, Quezon City MaintenanceNo barangay listed · 2024p.2
- ₱141.8 millionOn-goingConstruction of River Capacity Enhancement along San Juan River, Package 9No barangay listed · 2024p.2
- ₱141.8 millionOn-goingConstruction of River Capacity Enhancement Structure along San Juan River, Package 10No barangay listed · 2024p.2
- ₱97.2 millionOn-goingConstruction of Slope Protection Structure, Barangay North FairviewNorth Fairview · 2025p.2
- ₱97.2 millionOn-goingConstruction of Slope Protection Structure, Barangay Santa MonicaSta. Monica · 2025p.3
- ₱97.2 millionOn-goingConstruction of Flood Mitigation Structure, Barangay San BartolomeSan Bartolome · 2025p.2
- ₱97 millionOn-goingConstruction of Flood Mitigating Structure at Afp Road, Barangay Holy SpiritHoly Spirit · 2025p.2
- ₱97 millionOn-goingConstruction of Flood Mitigating Structure at Air Force Road, Barangay Holy SpiritHoly Spirit · 2025p.2
- ₱97 millionOn-goingRehabilitation of Handel Street to Liszt Street, Ideal, CommonwealthCommonwealth · 2025p.2
- ₱96.5 millionCompletedConstruction of Flood Mitigation Structure along Marikina River, Barangay Batasan HillsBatasan Hills · 2023p.2
- ₱96.5 millionCompletedConstruction of Flood Mitigation Structure along Marikina River, Barangay Bagong SilanganBagong Silangan · 2023p.1
- ₱96 millionOn-goingConstruction of Matalahib Creek Pumping StationNo barangay listed · 2024p.3
- ₱95.5 millionOn-goingConstruction of Flood Mitigation Structure along Marikina River Brgy. Bagong SilanganBagong Silangan · 2025p.1
- ₱95.5 millionCompletedConstruction of Flood Control Structure along Tullahan River and Tributaries, Barangay North FairviewNorth Fairview · 2024p.2
- ₱95.5 millionCompletedConstruction of Flood Control Structure along Tullahan River and Tributaries, Barangay FairviewFairview · 2024p.1
- ₱95.5 millionOn-goingConstruction of Flood Structure along Marikina River, Barangay Bagong SilanganBagong Silangan · 2025p.1
- ₱95.5 millionCompletedConstruction of Flood Control Structure along Tullahan River and Tributaries, Barangay Sta. MonicaSta. Monica · 2024p.3
- ₱95.5 millionCompletedConstruction of Flood Mitigation Structure along Marikina River, Sta. 20+800 to Sta. 20+900, Barangay Bagong SilanganBagong Silangan · 2024p.1
- ₱95.5 millionOn-goingConstruction of Flood Control Structure, Tullahan River, Barangay BagbagBagbag · 2025p.1
- ₱95.5 millionOn-goingRehabilitation of Riverwall along Tullahan River and Tributaries at Barangay San BartolomeSan Bartolome · 2025p.2
- ₱95.5 millionOn-goingConstruction of Flood Control Structure, Tullahan River, Barangay Sta. MonicaSta. Monica · 2025p.3
- ₱95.5 millionCompletedConstruction of Flood Control Structure along Tullahan River and Tributaries, Barangay BagbagBagbag · 2024p.1
- ₱95.3 millionCompletedConstruction of Flood Control Structure along Marikina River, Barangay Bagong SilanganBagong Silangan · 2024p.1
- ₱94.8 millionOn-goingRehabilitation of Flood Mitigation Structure along Tullahan River and Tributaries at Barangay Sta. MonicaSta. Monica · 2025p.3
- ₱94.8 millionOn-goingConstruction of Flood Mitigation Structure at Barangay FairviewFairview · 2025p.1
- ₱94.8 millionOn-goingConstruction of Flood Mitigation Structure at Barangay Pasong PutikPasong Putik Proper · 2025p.2
- ₱94.6 millionOn-goingRehabilitation of Flood Mitigation Structure along San Juan River, Barangay Tatalon, Quezon City (Phase 2Tatalon · 2024p.2
- ₱94.6 millionOn-goingConstruction of Flood Mitigation Structure along Marikina River, Phase 1No barangay listed · 2025p.2
- ₱94.6 millionOn-goingConstruction of Slope Protection Structure along Tullahan River and Tributaries (Phase 3), Barangay FairviewFairview · 2025p.1
- ₱94.6 millionOn-goingImprovement of Drainage Systems at Brgy. Holy Spirit, Q.CHoly Spirit · 2025p.2
- ₱94.6 millionOn-goingConstruction of Flood Mitigation Structure along Marikina River, Phase 2No barangay listed · 2025p.2
- ₱94.6 millionOn-goingRehabilitation of Flood Mitigation Structure along San Juan River,Barangay Tatalon, Quezon City (Phase 1)Tatalon · 2024p.2
- ₱94.6 millionOn-goingRehabilitation of Flood Mitigation Structure along Tullahan River and Tributaries at Barangay FairviewFairview · 2025p.1
- ₱94.6 millionOn-goingRehabilitation of Flood Mitigation Structure along San Juan River (Phase Lxii)No barangay listed · 2025p.2
- ₱94.6 millionOn-goingConstruction of Slope Protection Structure along Tullahan River and Tributaries (Phase 3), Barangay Novaliches ProperNovaliches Proper · 2025p.2
- ₱94.5 millionOn-goingConstruction of Flood Mitigation Structure, G. Araneta Avenue to San Juan River, Quezon City (Phase 2)No barangay listed · 2024p.2
- ₱94.5 millionOn-goingConstruction of Flood Mitigation Structure, G. Araneta Avenue to San Juan River, Quezon City (Phase 3)No barangay listed · 2024p.2
- ₱94.5 millionOn-goingConstruction of Flood Mitigation Structure, G. Araneta Avenue to San Juan River, Quezon City (Phase 4)No barangay listed · 2024p.2
- ₱94.5 millionOn-goingConstruction of Flood Mitigation Structure, G. Araneta Avenue to San Juan River, Quezon City (Phase 5)No barangay listed · 2024p.2
- ₱94.5 millionOn-goingConstruction of Flood Mitigation Structure, G. Araneta Avenue to San Juan River, Quezon City (Phase 1)No barangay listed · 2024p.3
- ₱93.6 millionCompletedConstruction of Flood Control Structure Within Brgy. Sta. MonicaSta. Monica · 2022p.3
- ₱92.6 millionCompletedImprovement of San Juan River (Phase Xiii)No barangay listed · 2022p.3
- ₱87.8 millionCompletedRehabilitation of Flood Mitigation Structure along San Juan River (Phase Xlvi)No barangay listed · 2024p.3
- ₱86.1 millionOn-goingRehabilitation of Flood Mitigation Structure along San Juan River (Phase Xlvii)No barangay listed · 2024p.3
- ₱84.9 millionCompletedConstruction of Flood Control Structure at Lumban Creek, Barangay Matandang Balara, Quezon City (Phase Iv)Matandang Balara · 2024p.2
- ₱83.4 millionCompletedConstruction of Slope Protection in Marikina River, Sta. 20+400 to Sta. 20+550, Brgy. Batasan HillsBatasan Hills · 2022p.2
- ₱83.4 millionCompletedConstruction of Slope Protection in Marikina River, Sta. 20+550 to Sta. 20+700, Brgy. Batasan HillsBatasan Hills · 2022p.2
- ₱77.3 millionCompletedRehabilitation of San Juan River, Phase VNo barangay listed · 2022p.3
- ₱77.2 millionCompletedConstruction Drainage Systems at Brgy. Apolonio SamsonApolonio Samson · 2024p.1
- ₱73.5 millionCompletedRehabilitation of Flood Control Structure, Barangay GulodGulod · 2022p.1
- ₱73.4 millionCompletedRehabilitation of Flood Control of Barangay San BartolomeSan Bartolome · 2022p.2
- ₱73.3 millionCompletedRehabilitation of Flood Control Structure, Barangay Sta. LuciaSta. Lucia · 2022p.3
- ₱72.5 millionCompletedMaintenance/Rehabilitation of Flood Control Structures, Brgy. Sta. LuciaSta. Lucia · 2022p.3
- ₱70.9 millionCompletedRehabilitation of Drainage System, Barangay South TriangleSouth Triangle · 2024p.2
- ₱67.5 millionCompletedRehabilitation of Flood Mitigation Structure along San Juan River (Phase Xlviii)No barangay listed · 2024p.3
- ₱63 millionOn-goingConstruction/Rehabilitation with Drainage Improvement of Various Roads at Barangay Pasong TamoPasong Tamo · 2025p.1
- ₱57.9 millionCompletedRoad Rehabilitation and Improvement at Tandang Sora AvenueNo barangay listed · 2024p.3
- ₱57.4 millionOn-goingRehabilitation of Drainage Systems at Brgy. Batasan HillsBatasan Hills · 2023p.2
- ₱56.7 millionOn-goingConstruction of Flood Mitigation Structures at (Pantranco, Marcel, Adezville), Barangay Pasong TamoPasong Tamo · 2025p.2
- ₱56.7 millionOn-goingConstruction of Flood Control Structures at Tullahan River, Barangay TalipapaTalipapa · 2025p.3
- ₱54.8 millionOn-goingConstruction of Flood Mitigation Structures (Varsity, Evergreen, Mapplewood) at Barangay Pasong TamoPasong Tamo · 2025p.2
- ₱54 millionCompletedConstruction of Flood Control Structure and Tributaries, Brgy. Payatas, Quezon City (Phase 9)Payatas · 2024p.3
- ₱53.8 millionCompletedConstruction of Flood Control Structure and Tributaries, Brgy. Commonwealth, Quezon City (Phase 8)Commonwealth · 2024p.2
- ₱49.5 millionCompletedRehabilitation of Flood Control Structure of Villa Verde Creek, Barangay Sta. MonicaSta. Monica · 2023p.3
- ₱49.5 millionCompletedConstruction of Slope Protection Structure along Marikina River Phase Ii, Barangay BagumbayanBagumbayan · 2024p.1
- ₱49.5 millionCompletedConstruction of River Capacity Enhancement Structure along Lagarian Creek, Quezon City (Phase V)No barangay listed · 2024p.3
- ₱49.5 millionCompletedConstruction of River Capacity Enhancement Structure along Lagarian Creek, Quezon City (Phase VI)No barangay listed · 2024p.3
- ₱49 millionCompletedConstruction of Flood Control Structure at Barangay CommonwealthCommonwealth · 2023p.2
- ₱49 millionCompletedRehabilitation of Marikina River Tributary Creek (Phase 2), AcropolisNo barangay listed · 2024p.2
- ₱49 millionCompletedRehabilitation of Tullahan River and Tributaries (Phase 2), Fairview, NovalichesFairview · 2023p.1
- ₱49 millionCompletedConstruction of Flood Control Structure along Pasong Tamo Creek, Barangay Pasong TamoPasong Tamo · 2023p.2
- ₱49 millionCompletedConstruction of Flood Control Structure at Lumban Creek, Barangay Matandang Balara, Quezon City (Phase Iii)Matandang Balara · 2023p.2
- ₱49 millionCompletedRehabilitation of Flood Control Structure (Phase 2), Barangay Sta. MonicaSta. Monica · 2023p.3
- ₱49 millionCompletedRehabilitation of Flood Control Structure (Phase 2), Barangay Pasong PutikPasong Putik Proper · 2023p.2
- ₱49 millionCompletedRehabilitation of Flood Control Structure of Barangay San Bartolome (Phase 2)San Bartolome · 2023p.3
- ₱49 millionCompletedRehabilitation of Flood Mitigation Structure along San Juan River (Phase Xix)No barangay listed · 2023p.3
- ₱49 millionCompletedRehabilitation of Flood Mitigation Structure along San Juan River (Phase Xx)No barangay listed · 2023p.3
- ₱48.9 millionCompletedRehabilitation of Flood Mitigation Structure along San Juan River (Phase Xxii)No barangay listed · 2023p.3
- ₱48.9 millionCompletedRehabilitation of Flood Mitigation Structure along San Juan River (Phase Xxi)No barangay listed · 2023p.3
- ₱48.9 millionCompletedRehabilitation of Flood Mitigation Structure along San Juan River (Phase Xxiii)No barangay listed · 2023p.3
- ₱48.9 millionOn-goingConstruction of Flood Control Structure at Sto. Domingo St.Sto. Domingo · 2024p.2
- ₱48.8 millionOn-goingConstruction of Flood Control Structure at Maria Clara St.Sto. Domingo · 2024p.2
- ₱48.8 millionCompletedConstruction of Slope Protection Structure along Marikina River Phase I, Barangay BagumbayanBagumbayan · 2024p.1
- ₱48.7 millionCompletedConstruction of Slope Protection Structure along Marikina River, Barangay Bagumbayan, Quezon City (Phase 4)Bagumbayan · 2024p.1
- ₱48.5 millionOn-goingConstruction of Flood Control Structure La Mesa Ecopark (Phase 2)No barangay listed · 2025p.4
- ₱48.5 millionOn-goingConstruction of Flood Mitigating Structure at Dalton Road, Barangay Holy SpiritHoly Spirit · 2025p.2
- ₱48.5 millionOn-goingConstruction of Flood Mitigating Structure at Constabulatory Road, Barangay Holy SpiritHoly Spirit · 2025p.3
- ₱48.5 millionOn-goingConstruction of Flood Control Structure, Barangay BagbagBagbag · 2025p.1
- ₱48.5 millionCompletedConstruction of Flood Control Structure and Tributaries at Barangay Holy Spirit, Quezon City (Phase 8)Holy Spirit · 2023p.3
- ₱48.5 millionCompletedConstruction of Flood Control Structure and Tributaries at Barangay Batasan- Commonwealth, Quezon City (Phase 7)Batasan, Commonwealth · 2023p.1
- ₱48.5 millionOn-goingConstruction of Flood Control Structure along Tanque CreekNo barangay listed · 2025p.3
- ₱48.5 millionOn-goingConstruction of Flood Control Structure along Mariblo Creek (Phase 2), Barangay Sta. CruzSta. Cruz · 2025p.2
- ₱48.5 millionOn-goingConstruction of Flood Control Structure along Aranan CreekNo barangay listed · 2025p.3
- ₱48.5 millionOn-goingConstruction of Flood Control Structure along Culiat Creek, Barangay Bagong Pag-AsaBagong Pag-Asa · 2025p.1
- ₱48.5 millionCompletedConstruction of Flood Control Structure at Barangay San Bartolome, Quezon City (Phase Ii)San Bartolome · 2024p.3
- ₱48.5 millionCompletedConstruction of Flood Control Structure at Talayan Creek, Barangay Sto. DomingoSto. Domingo · 2024p.2
- ₱48.5 millionCompletedConstruction of Flood Control Structure at Mariblo Creek, Barangay Sta. CruzSta. Cruz · 2024p.2
- ₱48.5 millionCompletedConstruction of Flood Control Structure at Culiat Creek, Barangay VasraVasra · 2024p.3
- ₱48.5 millionCompletedConstruction of Flood Control Structure at Dario Creek, Barangay Bahay ToroBahay Toro · 2024p.1
- ₱48.5 millionCompletedConstruction of Flood Control Structure and Tributaries at Barangay Bagong SilanganBagong Silangan · 2025p.1
- ₱48.5 millionOn-goingConstruction of Flood Control Structure and Tributaries at Payatas (Phase 9)Payatas · 2025p.3
- ₱48.5 millionCompletedConstruction of Flood Control Structure and Tributaries (Phase 9), Barangay Batasan HillsBatasan Hills · 2024p.2
- ₱48.5 millionCompletedConstruction of Flood Control Structure and Tributaries (Phase 8), Barangay Bagong SilanganBagong Silangan · 2024p.1
- ₱48.5 millionCompletedConstruction of Flood Control Structure at Barangay Batasan HillsBatasan Hills · 2023p.2
- ₱48.5 millionOn-goingConstruction of Flood Control Structure Tullahan River, Brgy. Nagkaisang NayonNagkaisang Nayon · 2025p.1
- ₱48.5 millionCompletedRehabilitation of Flood Control Structure, Brittany Annex, Barangay Sta. MonicaSta. Monica · 2024p.3
- ₱48.5 millionCompletedConstruction of Flood Control Structure at Barangay Novaliches Proper, Quezon City (Phase Ii)Novaliches Proper · 2024p.2
- ₱48.4 millionCompletedConstruction of Flood Mitigating Structure at Afp Road, Barangay Holy SpiritBatasan Hills · 2023p.2
- ₱48.4 millionCompletedConstruction of Flood Control Structure along Tullahan River, Bagong Tulay, Barangay GulodGulod · 2024p.1
- ₱48.4 millionOn-goingConstruction of Flood Control Structure Barangay Pasong PutikPasong Putik Proper · 2025p.2
- ₱48.2 millionCompletedRehabilitation of Drainage System, Barangay TatalonTatalon · 2024p.2
- ₱48.2 millionCompletedRehabilitation of Flood Control Structure at Barangay Sta. LuciaSta. Lucia · 2024p.3
- ₱48.1 millionOn-goingConstruction of Flood Mitigation Structure along Marikina River, Phase 3, Barangay BagumbayanBagumbayan · 2025p.1
- ₱48.1 millionOn-goingConstruction of Flood Mitigation Structure along Marikina River, Phase 2, Barangay BagumbayanBagumbayan · 2025p.1
- ₱48.1 millionOn-goingConstruction of Flood Mitigation Structure at Barangay Nagkaisang NayonNagkaisang Nayon · 2025p.2
- ₱48 millionCompletedConstruction of Flood Control Structure and Tributaries along Culiat Creek, Barangay Project 6Project 6 · 2023p.2
- ₱48 millionCompletedConstruction of Flood Control Structure and Tributaries along Culiat Creek, Barangay Bahay ToroBahay Toro · 2023p.1
- ₱48 millionCompletedConstruction of Flood Control Structure and Tributaries along San Francisco River (Phase Ii)No barangay listed · 2022p.3
- ₱48 millionOn-goingDrainange Improvement and Concreting of Various Roads at Barangay SangandaanSangandaan · 2025p.2
- ₱48 millionOn-goingConstruction of Flood Mitigation Structure,Riverside, Barangay CommonwealthCommonwealth · 2025p.2
- ₱48 millionOn-goingConstruction of Drainage Structure, Barangay Bagong SilanganBagong Silangan · 2025p.1
- ₱48 millionCompletedRehabilitation of Flood Control Structure (Phase 2), Barangay GulodGulod · 2023p.1
- ₱48 millionCompletedConstruction of Flood Control Structure and Tributaries at Barangay Payatas, Quezon City (Phase 8)Payatas · 2023p.3
- ₱48 millionCompletedConstruction of Flood Control Structure at La Mesa EcoparkFairview · 2023p.1
- ₱48 millionCompletedConstruction of Flood Control Structure and Tributaries at Barangay Bagong Silangan, Quezon City (Phase 7)Bagong Silangan · 2023p.1
- ₱48 millionOn-goingConstruction of Flood Mitigation Structure along Marikina River, Phase 4, Barangay BagumbayanBagumbayan · 2025p.1
- ₱48 millionOn-goingConstruction of Flood Mitigation Structure along Marikina River, Phase 5, Barangay BagumbayanBagumbayan · 2025p.1
- ₱48 millionOn-goingConstruction of Flood Mitigation Structure along Marikina River, Phase 6, Barangay BagumbayanBagumbayan · 2025p.1
- ₱48 millionOn-goingRehabilitation of San Juan River, Phase 3No barangay listed · 2025p.3
- ₱48 millionOn-goingRehabilitation of San Juan River, Phase 2No barangay listed · 2025p.3
- ₱48 millionOn-goingRepair/ Rehabilitation of Flood Control Structures at Pasong Tamo Creek, Brgy. Bahay ToroBahay Toro · 2024p.1
- ₱48 millionOn-goingConstruction of Flood Mitigation Structure along Culiat Creek, Phase Ii, Barangay Bahay ToroBahay Toro · 2025p.1
- ₱48 millionOn-goingRehabilitation of San Juan River, Phase 1No barangay listed · 2025p.3
- ₱48 millionCompletedRehabilitation of Flood Control Structure along Ilang-Ilang Creek Leading to Tullahan River, Barangay Sta. MonicaSta. Monica · 2023p.3
- ₱47.9 millionCompletedRehabilitation of Flood Mitigation Structure along San Juan River (Phase Xviii)No barangay listed · 2023p.3
- ₱47.8 millionOn-goingConstruction of Flood Mitigation Structure Barangay San BartolomeSan Bartolome · 2024p.3
- ₱47.4 millionOn-goingRehabilitation of Flood Mitigation Structure along San Juan River (Phase Xc)No barangay listed · 2024p.3
- ₱47.4 millionOn-goingRehabilitation of Flood Mitigation Structure along San Juan River (Phase Xci)No barangay listed · 2024p.3
- ₱47.4 millionOn-goingRehabilitation of Flood Mitigation Structure along San Juan River (Phase Xcii)No barangay listed · 2024p.3
- ₱47.3 millionOn-goingRehabilitation of Flood Mitigation Structure along San Juan River, Quezon City (Phase Lxx)No barangay listed · 2024p.3
- ₱47.3 millionOn-goingRehabilitation of Flood Mitigation Structure along San Juan River, Quezon City (Phase Lxxi)No barangay listed · 2024p.4
- ₱47.3 millionOn-goingRehabilitation of Duyan-Duyan Creek Phase 5, Barangay Loyola HeightsLoyola Heights · 2024p.2
- ₱47.3 millionOn-goingRehabilitation of Flood Mitigation Structure along San Juan River, Quezon City (Phase Lxxii)No barangay listed · 2024p.4
- ₱47.3 millionOn-goingRehabilitation of Drainage System, Barangay PinyahanPinyahan · 2024p.1
- ₱47.3 millionOn-goingRehabilitation of Flood Mitigation Structure along San Juan River (Phase Lxiii)No barangay listed · 2025p.4
- ₱46.6 millionCompletedConstruction of Flood Control Structure and Tributaries along San Francisco River (Phase Iii)No barangay listed · 2022p.3
- ₱44.2 millionCompletedConstruction of Flood Control Structure, Brgy. Bagong SilanganBagong Silangan · 2022p.1
- ₱44.1 millionCompletedConstruction of Flood Control Structure and Tributaries along Culiat Creek (Right Side) Barangay VasraVasra · 2022p.3
- ₱44 millionCompletedConstruction of Flood Mitigation Structure at Barangay PayatasPayatas · 2024p.3
- ₱43.7 millionOn-goingConstruction of Flood Mitigation Structures and Drainage Systems at Brgy. SauyoSauyo · 2024p.2
- ₱43.1 millionCompletedRehabilitation of San Juan River, Phase IiNo barangay listed · 2022p.4
- ₱43.1 millionCompletedRehabilitation of San Juan River, Phase IiiNo barangay listed · 2022p.4
- ₱43.1 millionCompletedRehabilitation of San Juan River, Phase INo barangay listed · 2022p.4
- ₱42.9 millionCompletedRehabilitation of San Juan River, Phase IvNo barangay listed · 2022p.4
- ₱42.8 millionCompletedConstruction of Flood Control Structure and Tributaries along Culiat Creek (Left Side) Barangay Bahay ToroBahay Toro · 2022p.1
- ₱42.8 millionCompletedConstruction of Flood Control Structure and Tributaries along Culiat Creek (Right Side) Barangay Bahay ToroBahay Toro · 2022p.1
- ₱42.8 millionCompletedConstruction of Flood Control Structure and Tributaries along Culiat Creek (Left Side) Barangay VasraVasra · 2022p.3
- ₱42.8 millionCompletedConstruction of Slope Protection Structure along Marikina River, Barangay Bagong SilanganBagong Silangan · 2023p.1
- ₱42.7 millionCompletedConstruction of Flood Control Structure and Tributaries along San Francisco River, Phase INo barangay listed · 2022p.3
- ₱42.3 millionCompletedConstruction of Slope Protection Structure in Marikina River, Sta. 20+150 to Sta. 20+400, Brgy. Batasan HillsBatasan Hills · 2022p.2
- ₱42.2 millionCompletedRehabilitation of Flood Mitigation Structure along San Juan River, Quezon City (Phase Xv)No barangay listed · 2023p.4
- ₱41.7 millionCompletedRehabilitation of Flood Mitigation Structure along San Juan River, Quezon City (Phase Xvii)No barangay listed · 2023p.4
- ₱41.3 millionCompletedRehabilitation of Flood Mitigation Structure along San Juan River, Quezon City (Phase Xvi)No barangay listed · 2023p.4
- ₱39.2 millionCompletedRehabilitation of Flood Mitigation Structure along San Juan River (Phase L)No barangay listed · 2024p.4
- ₱39.2 millionOn-goingRehabilitation of Flood Mitigation Structure along San Juan River (Phase Xlix)No barangay listed · 2024p.4
- ₱39.1 millionCompletedRehabilitation of Flood Control Structure, San Juan River (Phase 6)No barangay listed · 2022p.4
- ₱38.8 millionOn-goingConstruction of Concrete Road with Drainage at Tierra Bella, Barangay CuliatCuliat · 2025p.1
- ₱38.8 millionCompletedConstruction of Flood Mitigation Structures and Drainage Systems at Brgy. Tandang SoraTandang Sora · 2024p.3
- ₱38.7 millionOn-goingRehabilitation of Marikina River Tributary Creek (Phase 3)No barangay listed · 2025p.2
- ₱38.4 millionCompletedConstruction of Flood Control Structure along San Francisco RiverNo barangay listed · 2023p.3
- ₱38.4 millionCompletedConstruction of Flood Control Structure, Barangay SauyoSauyo · 2022p.2
- ₱38.2 millionOn-goingRehabilitation /Reconstruction of Slope Protection Structure of Tullahan River along Barangay Nagkaisang NayonNagkaisang Nayon · 2024p.2
- ₱38.2 millionOn-goingConstruction of Flood Control Structure and Drainage Improvement at Goodwill, Brgy. San BartolomeSan Bartolome · 2024p.3
- ₱37.6 millionCompletedRehabilitation of Flood Control Structure, San Juan River (Phase 7)No barangay listed · 2022p.4
- ₱36 millionCompletedConstruction of Flood Control Structure, Brgy. New EraNew Era · 2022p.1
- ₱35.7 millionOn-goingConstruction of Flood Control Structures at Dario Creek, Barangay TalipapaTalipapa · 2025p.3
- ₱33.9 millionOn-goingRehabilitation of Road and Drainage at West Riverside and Valencia Street, Del MonteDel Monte · 2025p.1
- ₱33.2 millionCompletedConstruction of Flood Structure and Tributaries at Barangay Batasan Hills (Phase 10)Batasan Hills · 2025p.2
- ₱32.7 millionCompletedConstruction of Slope Protection Structure along Marikina River Phase Iii, Barangay BagumbayanBagumbayan · 2024p.1
- ₱32.4 millionOn-goingRehabilitation of Flood Control Structure (Phase 2), Barangay Pasong PutikPasong Putik Proper · 2024p.2
- ₱29.7 millionCompletedRehabilitation / Construction of Box Culvert (Drainage Outfall), National Kidney and Transplant Institute (Nkti) CompoundDiliman · 2024p.1
- ₱29.7 millionCompletedRehabilitation of Drainage System, Barangay Laging HandaLaging Handa · 2024p.1
- ₱29.7 millionCompletedRehabilitation of Drainage System, Barangay KamuningKamuning · 2024p.1
- ₱29.7 millionCompletedRehabilitation of Drainage System, Barangay Sacred HeartSacred Heart · 2024p.1
- ₱29.5 millionCompletedRehabilitation of Drainage System, Barangay MarianaMariana · 2024p.1
- ₱29.4 millionOn-goingConstruction of Road at Mabuhay St., Brgy. Batasan HillsBatasan Hills · 2025p.2
- ₱29.4 millionOn-goingConstruction of Roads Including Flood Control Structures at Barangay BalingasaBalingasa · 2024p.1
- ₱29.4 millionCompletedRehabilitation of Flood Control Structure at Palmera Phase Iv, Barangay Sta. MonicaSta. Monica · 2024p.3
- ₱29.4 millionCompletedRehabilitation of Flood Control Structure at St. James, Barangay Nagkaisang NayonNagkaisang Nayon · 2024p.2
- ₱29.4 millionCompletedConstruction of Flood Control Structures at Brgy. Pasong TamoPasong Tamo · 2023p.2
- ₱29.4 millionCompletedRehabilitation of Flood Control Structure (Phase 2), Barangay Sta. LuciaSta. Lucia · 2023p.3
- ₱29.4 millionCompletedRehabilitation of Drainage System, Barangay BagumbayanBagumbayan · 2023p.1
- ₱29.4 millionCompletedRehabilitation of Flood Control Structure, Lagarian Creek, Barangay Kristong HariKristong Hari · 2022p.1
- ₱29.1 millionOn-goingRehabilitation of Flood Control Structure at Barangay BagbagBagbag · 2024p.1
- ₱29.1 millionCompletedConstruction of Flood Control Structure at Barangay BaesaBaesa · 2025p.1
- ₱29.1 millionOn-goingConstruction of Flood Control Structure at Barangay Pasong TamoPasong Tamo · 2025p.2
- ₱28.9 millionCompletedRehabilitation of San Juan River (Phase Vii)No barangay listed · 2022p.4
- ₱28.9 millionCompletedRehabilitation of San Juan River (Phase VI)No barangay listed · 2022p.4
- ₱28.9 millionOn-goingConstruction of Drainage System at Victorian Heights Brgy. SauyoSauyo · 2024p.2
- ₱28.8 millionCompletedConstruction of Flood Control Structures at Pangilinan, Brgy. Tandang SoraTandang Sora · 2023p.3
- ₱28.8 millionOn-goingDrainage Improvement at Barangay BaesaBaesa · 2025p.1
- ₱28.8 millionCompletedConstruction of Flood Control Structures at Brgy. BaesaBaesa · 2022p.4
- ₱28.8 millionOn-goingRehabilitation of Road with Drainage Improvement at Mira Nila Homes, Brgy. Pasong TamoPasong Tamo · 2025p.2
- ₱28.8 millionCompletedConstruction of Flood Control Structure at Culiat Creek, Barangay Sto. CristoSto. Cristo · 2024p.2
- ₱28.7 millionCompletedConstruction of Flood Control Structures, Barangay CuliatCuliat · 2022p.1
- ₱28.5 millionCompletedConstruction of Flood Control Structure at Brgy. Tandang SoraTandang Sora · 2022p.3
- ₱28.5 millionOn-goingDrainage Improvement and Concreting of Roads at Brgy. SauyoSauyo · 2023p.2
- ₱28.4 millionCompletedRehabilitation of San Juan River Phase 7No barangay listed · 2022p.4
- ₱28.3 millionCompletedConstruction of Flood Control Structures at Lumban Creek (Phase Ii), Barangay Matandang BalaraMatandang Balara · 2022p.2
- ₱28.2 millionCompletedRehabilitation of Flood Control Structure, Kaybukot Creek, Barangay GulodGulod · 2024p.1
- ₱28.1 millionCompletedConstruction of Road Including Drainage at Mines and Other Streets of Barangay VasraVasra · 2023p.3
- ₱27.8 millionCompletedRehabilitation of San Juan River (Phase Viii)No barangay listed · 2022p.4
- ₱27.8 millionCompletedRehabilitation of San Juan River (Phase Ix)No barangay listed · 2022p.4
- ₱24.7 millionCompletedConstruction of Retaining Wall at Libis Elementary School (Phase 1), Barangay LibisLibis · 2022p.1
- ₱24.3 millionOn-goingRehabilitation of Road and Drainage (Phase 2) at Barangay SiennaSiena · 2025p.2
- ₱24.2 millionOn-goingConstruction of Drainage Systems at Kaingin Road, Brgy. Apolonio SamsonApolonio Samson · 2024p.1
- ₱23.9 millionCompletedRehabilitation / Reconstruction of Retaining Wall of Tullahan River along Barangay San BartolomeSan Bartolome · 2024p.3
- ₱23.2 millionCompletedRehabilitation of San Juan River (Phase X)No barangay listed · 2022p.4
- ₱21.8 millionCompletedRehabilitation of San Juan River (Phase Xiv)No barangay listed · 2022p.4
- ₱20.2 millionCompletedRehabilitation of Flood Mitigation Structure along Lagarian CreekNo barangay listed · 2024p.4
- ₱20.2 millionCompletedConstruction of Flood Control Structure at Brgy. Tandang SoraTandang Sora · 2022p.3
- ₱19.8 millionCompletedConstruction of Roads at Sitio Veterans, Brgy. Bagong Silangan, Q.C.Bagong Silangan · 2023p.1
- ₱19.6 millionCompletedRehabilitation of Flood Control Structure along Regalado HighwayNo barangay listed · 2022p.4
- ₱19.6 millionCompletedRehabiilitation of Road and Drainage Improvement, Mira Nila Homes, Barangay Pasong TamoPasong Tamo · 2024p.2
- ₱19.6 millionCompletedRehabilitation of Drainage System, Barangay Ugong NorteUgong Norte · 2024p.2
- ₱19.6 millionCompletedConstruction of Drainage Systems at JEM 9, Brgy. Tandang SoraTandang Sora · 2024p.3
- ₱19.6 millionCompletedRehabilitation of Drainage System at K-6Th Street, Barangay KamuningKamuning · 2023p.1
- ₱19.6 millionOn-goingRehabilitation of Drainage Main, Barangay CentralCentral · 2024p.1
- ₱19.6 millionCompletedConstruction of Flood Control Structure, Barangay San AgustinSan Agustin · 2023p.2
- ₱19.6 millionCompletedRehabilitation of Lagarian CreekNo barangay listed · 2023p.2
- ₱19.4 millionOn-goingConstruction of Road with Drainage Structure, Barangay CommonwealthCommonwealth · 2025p.2
- ₱19.4 millionOn-goingConstruction of Concrete Road with Drainage at Barangay Tandang SoraTandang Sora · 2025p.3
- ₱19.4 millionCompletedRehabilitation of Drainage System, Barangay LibisLibis · 2023p.1
- ₱19.4 millionOn-goingConstruction of Concrete Road with Drainage at Brgy. SauyoSauyo · 2025p.2
- ₱19.4 millionCompletedConstruction of Drainage Systems at Veterans, Brgy. Pasong TamoPasong Tamo · 2024p.2
- ₱19.4 millionOn-goingConstruction of Flood Control Structure along Balingasa Creek, Brgy. BalingasaBalingasa · 2025p.1
- ₱19.4 millionOn-goingConstruction of Flood Control Structure Barangay Pasong PutikNagkaisang Nayon · 2025p.2
- ₱19.4 millionCompletedConstruction of Flood Control Structure at Culiat Creek, Barangay KatipunanKatipunan · 2024p.2
- ₱19.4 millionOn-goingConstruction of Concrete Road with Drainage at Brgy. SangandaanSangandaan · 2025p.2
- ₱19.4 millionOn-goingConstruction of Concrete Road with Drainage at Barangay Apolonio SamsonApolonio Samson · 2025p.1
- ₱19.4 millionCompletedConstruction of Drainage Systems at Brgy. BalonbatoBalon Bato · 2024p.1
- ₱19.4 millionOn-goingRehabilitation of Drainage System, Brgy. White PlainsWhite Plains · 2025p.2
- ₱19.4 millionCompletedRehabilitation of Flood Control Structure at Tullahan River at Barangay Nagkaisang NayonNagkaisang Nayon · 2024p.2
- ₱19.4 millionCompletedRehabilitation of Road and Drainage at Jersey Hilltop Street, Barangay Bahay ToroBahay Toro · 2025p.1
- ₱19.4 millionOn-goingConstruction of Drainage Systems at CMP 1 Brgy. BaesaBaesa · 2024p.1
- ₱19.2 millionOn-goingDrainage Improvement and Rehabilitation at Cruz and Saplan, Barangay CuliatCuliat · 2025p.1
- ₱19.2 millionOn-goingConstruction/Rehabilitation of Roads and Drainages Brgy. Pasong TamoPasong Tamo · 2025p.2
- ₱19.2 millionCompletedConstruction of Retaining Wall, Barangay LibisLibis · 2024p.1
- ₱19.2 millionCompletedConstruction of Drainage Systems at Brgy. Pasong TamoPasong Tamo · 2024p.2
- ₱19.2 millionOn-goingDrainage Improvement and Concreting of Road at Torres, Barangay Tandang SoraTandang Sora · 2025p.3
- ₱19.2 millionOn-goingDrainage Improvement and Rehabilitation at B. Oliveros Brgy. Apolonio SamsonApolonio Samson · 2025p.1
- ₱19.1 millionOn-goingConstruction of Flood Control Structure along Pasong Tamo Creek, Barangay Bahay ToroBahay Toro · 2024p.1
- ₱19.1 millionOn-goingConstruction of Flood Control Structure along San Francisco River (Phase Iv)No barangay listed · 2025p.3
- ₱19.1 millionOn-goingConstruction of Flood Control Structure along Culiat River (Phase 2) Right Side, Barangay Bahay ToroBahay Toro · 2025p.1
- ₱19 millionCompletedConstruction of Revetment along Dario Creek, Sta. 0+020.000 to Sta. 0+351.894 (Left & Right River Bank)No barangay listed · 2022p.3
- ₱19 millionCompletedConstruction of Road and Drainage Improvement at Barangay BaesaBaesa · 2022p.1
- ₱19 millionCompletedRehabilitation of Flood Control Structure, Barangay West FairviewWest Fairview · 2022p.4
- ₱19 millionCompletedConstruction of Flood Control Structure at Maceda Bridge, Brgy. TalipapaTalipapa · 2022p.3
- ₱19 millionCompletedConstruction of Flood Control Structure at San Francisco River, Barangay TalayanTalayan · 2023p.3
- ₱18.8 millionCompletedConstruction of Flood Control Structure and Tributaries, Bagong SilanganBagong Silangan · 2022p.1
- ₱18.5 millionCompletedRehabilitation of San Juan River (Phase Xi)No barangay listed · 2022p.5
- ₱18 millionOn-goingRehabilitation of Flood Mitigation Structure at Dario Creek, Brgy. TalipapaTalipapa · 2025p.3
- ₱14.7 millionCompletedConstruction of Drainage Systems at Nocom and Various Connecting Drainages, Brgy. Tandang SoraTandang Sora · 2024p.3
- ₱14.7 millionCompletedRehabilitation of Duyan-Duyan CreekNo barangay listed · 2023p.2
- ₱14.6 millionCompletedRehabilitation of Road and Drainage at Valencia St., Barangay Del MonteDel Monte · 2024p.2
- ₱14.5 millionCompletedConstruction of Drainage Systems at Gulod and Various Connecting Roads and Drainages, Brgy. Sauyo, District VISauyo · 2024p.3
- ₱14.5 millionCompletedConstruction of Flood Mitigation Structures and Drainage Systems at Tibagan, Brgy. BaesaBaesa · 2024p.1
- ₱14.5 millionCompletedRehabilitation of Flood Control Structure, Barangay Pasong PutikPasong Putik Proper · 2022p.2
- ₱14.3 millionCompletedConstruction of Flood Control Structure at Brgy. BaesaBaesa · 2022p.1
- ₱14.3 millionCompletedRehabilitation of Flood Control Structure, Barangay Sta. MonicaSta. Monica · 2022p.4
- ₱14.3 millionCompletedConstruction of Flood Control Structure, Brgy. Pasong TamoPasong Tamo · 2022p.2
- ₱14.3 millionCompletedRehabilitation of Drainage, De Jesus St. and Judge Juan Luna St.No barangay listed · 2022p.3
- ₱14.3 millionCompletedRehabilitation of Flodd Control Structure, Barangay Nagkaisang NayonNagkaisang Nayon · 2022p.2
- ₱13.9 millionCompletedRehabilitation and Drainage Input of Various Alleys, CentralCentral · 2022p.1
- ₱13.6 millionOn-goingRehabilitation of San Juan River, Phase 4No barangay listed · 2025p.5
- ₱12 millionCompletedImprovement of Road Including Drainage System, Banahaw St., Group 2, Area B, Barangay PayatasPayatas · 2024p.3
- ₱12 millionOn-goingConstruction of Flood Control Structure along Dario Creek (Phase 2), Barangay Bahay ToroBahay Toro · 2025p.1
- ₱11.8 millionCompletedConstruction of Drainage Systems at Brgy. BaesaBaesa · 2024p.1
- ₱11.8 millionCompletedRehabilitation of Drainage System, Barangay Blue Ridge BBlue Ridge B · 2023p.1
- ₱9.8 millionCompletedConstruction of Flood Control Structure along San Francisco River in Brgy. San AntonioSan Antonio · 2023p.2
- ₱9.8 millionCompletedConstruction of Roads and Drainage Systems, Mira Nila, Brgy. Pasong TamoPasong Tamo · 2024p.2
- ₱9.8 millionCompletedConstruction of Drainage Systems, Tierra Pura, Brgy. CuliatCuliat · 2024p.1
- ₱9.8 millionCompletedConstruction of Road Including at Masbate Street, Barangay Ramon MagsaysayRamon Magsaysay · 2022p.2
- ₱9.8 millionCompletedConstruction of Drainage Systems at Capricorn and Various Connecting Drainages, Brgy. Tandang SoraTandang Sora · 2024p.3
- ₱9.8 millionCompletedRehabilitation of Drainage Talayan RoadTalayan · 2022p.3
- ₱9.8 millionCompletedRehabilitation of Flood Mitigation Structure along Lagarian Creek, Quezon City (Phase Ii)No barangay listed · 2023p.5
- ₱9.8 millionCompletedRehabilitation of Drainage, Road 2No barangay listed · 2022p.3
- ₱9.8 millionCompletedConstruction / Maintenance of Flood Mitigation Structures and Drainage Systems, Brgy. BalonbatoBalon Bato · 2024p.1
- ₱9.8 millionOn-goingConstruction of Drainage Systems at Aguilar, Brgy. Tandang SoraTandang Sora · 2024p.3
- ₱9.8 millionCompletedRehabilitation of Drainage System, Barangay MalayaMalaya · 2022p.1
- ₱9.8 millionCompletedRehabilitation of Libis CreekNo barangay listed · 2024p.2
- ₱9.8 millionCompletedRehabilitation of Marikina River Tributary Creek, AcropolisNo barangay listed · 2023p.2
- ₱9.8 millionCompletedRehabilitation of Road and Drainage (Phase 2) at Barangay Ramon MagsaysayRamon Magsaysay · 2025p.2
- ₱9.7 millionOn-goingConstruction of Drainage Systems at St. Jude and Various Connecting Drainages at Brgy. BaesaBaesa · 2024p.1
- ₱9.7 millionCompletedConstruction of Flood Control Structure and Tributaries along Pasong Tamo Creek, Sta. 0+000 to Sta. 0+805 (Left Side)No barangay listed · 2023p.4
- ₱9.7 millionOn-goingConstruction of Drainage Systems at Damayan, Brgy. Tandang SoraTandang Sora · 2024p.3
- ₱9.7 millionCompletedImprovement of Various Roads with Drainage Improvement, Barangay Ramon Magsaysay,Ramon Magsaysay · 2023p.2
- ₱9.7 millionOn-goingConstruction of Drainage Systems at Fercon and Connecting Drainages, Brgy. Tandang SoraTandang Sora · 2024p.3
- ₱9.6 millionCompletedConstruction of Roads at Acacia to Talisay Brgy. Payatas Q.C.Payatas · 2023p.3
- ₱9.6 millionCompletedDrainage Improvement and Concreting of Roads and Alleys, Rosalia Village, Brgy. Tandang SoraTandang Sora · 2023p.3
- ₱9.5 millionCompletedConstruction of Flood Control Structure at Brgy. Unang SigawUnang Sigaw · 2022p.3
- ₱9.5 millionCompletedConstruction of Flood Control Structure, Barangay Tandang SoraTandang Sora · 2022p.3
- ₱9.5 millionCompletedRehabilitation of Drainage Road 3 (Pag- Asa)Project 6 · 2022p.2
- ₱8.6 millionCompletedRehabilitation of Drainage System, Barangay ClaroClaro · 2023p.1
- ₱7.9 millionCompletedRehabilitation and Drainage Input of Various Alleys, San Martin De PorresSan Martin de Porres · 2022p.2
- ₱7.7 millionCompletedRehabilitation of Various Roads with Drainage Improvement at Brgy. San JoseSan Jose · 2023p.2
- ₱7.6 millionCompletedRehabilitation of Various Roads with Drainage Improvement at Brgy. MaribloMariblo · 2023p.2
- ₱6.9 millionCompletedRehabilitation of Drainage System, Barangay Old BalaraMatandang Balara · 2023p.2
- ₱6.8 millionOn-goingRehabilitation of Road and Drainage (Phase 2) at Barangay MaribloMariblo · 2025p.2
- ₱6.7 millionCompletedRehabilitation of Various Roads with Drainage Improvement at Brgy. SiennaSiena · 2023p.2
- ₱5.6 millionCompletedRehabilitation of Drainage System, Barangay Saint IgnatiusSaint Ignatius · 2023p.2
- ₱4.9 millionCompletedRehabilitation / Improvement of Drainage System, Barangay GulodGulod · 2023p.1
- ₱4.9 millionCompletedImprovement of Road and Drainage at Sunflower St., Brgy. Payatas, Q.C.Payatas · 2023p.3
- ₱4.9 millionCompletedConstruction of Flood Control Structure along San Francisco River, Brgy. San AntonioSan Antonio · 2024p.2
- ₱4.9 millionCompletedRehabilitation of Drainage System, Barangay PinyahanPinyahan · 2022p.1
- ₱4.9 millionCompletedRehabilitation of Buaya CreekNo barangay listed · 2023p.3
- ₱4.8 millionOn-goingRehabilitation of Flood Control Structure at Barangay San AgustinSan Agustin · 2025p.2
- ₱4.7 millionCompletedConstruction of Drainage System at Barangay PansolPansol · 2022p.2
- ₱4.7 millionCompletedRehabilitation of Drainage System at Barangay AmihanAmihan · 2022p.1